Delivery and installation of a prefabricated building with an electric crane-beam 5 tons
Features:
• Development of a building project from scratch;
• All equipment is installed in explosion-proof design;
• Ventilation system with air intake from 15 meters, designed to assimilate a heat surplus of 340 kW